This page lists the Measurements report Finished Jobs with Local Projected Times area fields.
Element |
Description |
Number of Jobs |
the number of finished jobs that had local projected times |
Nbr within Projected |
the number of jobs finished within the local projected time |
Actual Time |
the total time applied to finished jobs with local projected times |
Actual vs Projected |
total actual time minus total projected time |
% of All Jobs |
the number of finished jobs with local projected times as a percentage of all finished jobs |
% within Projected |
the number of jobs finished within projected times as a percentage of all finished jobs with projected times |
Projected Time |
the sum of the projected times for all finished jobs with projected times |
% |
the total actual time recorded as a percentage of the total projected time |