Measurements Statistics

This page lists the Measurements report Statistics area fields.

 

Element

Description

Number of Finished R/O’s

number of ROs finished during the selected period

Inside Nbr / Pct

the number and percentage of finished ROs that were done inside

Outside (DBM) Nbr / Pct

the number and percentage of finished ROs that were done by the manufacturer (DBM)

Non-DBM

the number and percentage of finished ROs that were done by an outside vendor (not the manufacturer)(non-DBM)

Number of Finished Jobs

total number of jobs finished during the selected period

Warranty Nbr / Per Day

the number and average per day of finished jobs identified as warranty (days with no labor hours entered do not count)

P.M.’s Nbr / Per Day

the number and average per day of finished jobs identified as PM (days with no labor hours entered do not count)

Oil Quantity Nbr / Per Day

the quantity and average per day of oil used for the finished jobs (days with no labor hours entered do not count)

Number of New R/O’s

number of ROs created during the period

Inside Nbr / Pct

the number and percent of inside ROs

Outside (DBM) Nbr / Pct

the number and percent of ROs done by the manufacturer

Non-DBM Nbr / Pct

the number and percent of ROs completed by an outside vendor (not the manufacturer)

Number of New Jobs

number of jobs created during the period

Fleet Size

current number of Penske vehicles assigned

Number of Substitutes

the current number of vehicles substituted