Standard vs Actual Time Exceptions

The Standard vs Actual Time Exceptions report lists repairs within the specified dates where actual labor was greater than the projected. Selections include the standard date area, correction and the projected times to include. You cannot sort the report.

 

Standard vs Actual Exceptions Columns

Column

Description

Comp Code

the component code of the job listed in the RO

Profile Name

job name as it appears in the Planner

Correction

job description

Projected

projected time for the correction

Est

a "Y" is displayed if the goal time is a local estimate rather than a national standard

Average Actual

average number of recorded hours for this job

Total Jobs

number of jobs within this correction

Jobs Over Projected

number of jobs within correction that exceeded the projected time

% of Jobs Over Projected

percentage of times the actual job time exceeded projected time

Deviation

the difference between the Average Actual and Goal times

 