The Standard vs Actual Time Exceptions report lists repairs within the specified dates where actual labor was greater than the projected. Selections include the standard date area, correction and the projected times to include. You cannot sort the report.
Standard vs Actual Exceptions Columns
Column |
Description |
Comp Code |
the component code of the job listed in the RO |
Profile Name |
job name as it appears in the Planner |
Correction |
job description |
Projected |
projected time for the correction |
Est |
a "Y" is displayed if the goal time is a local estimate rather than a national standard |
Average Actual |
average number of recorded hours for this job |
Total Jobs |
number of jobs within this correction |
Jobs Over Projected |
number of jobs within correction that exceeded the projected time |
% of Jobs Over Projected |
percentage of times the actual job time exceeded projected time |
Deviation |
the difference between the Average Actual and Goal times |