Applied Labor

The Applied Labor report lists jobs that have applied labor during the period. Selections include the standard date area, Shop User(s), and Shift. Additional selections include correction, job types, standard times to include, and road calls to include. Sort the report by correction, shop user, date, or shift. The appearance of the report changes depending on the sort criteria selected. If you sort by correction, the report displays an average for, Actual Hours, Job Standard, and Variance. If you sort by shop user, the report displays a subtotal of the Actual Hours and Variance for each date and the total Actual Hours and Variance for each shop user. If you sort by date, the report displays the total Actual Hours and Variance. If you sort by shift, the report displays a subtotal of the Actual Hours and Variance and the total Actual Hours and Variance.

 

Applied Labor Report Columns

Column

Description

ID

the shop user’s nick name from the Setup Techs option

Name

the shop user’s last and first name

Shift

the shift of the shop user

Date

date that labor was applied (* means shared/split job)

Correction

job description

Unit#

unit number entered in RO

Actual Hours

number of labor hours applied

Job Std

goal time

Est

Y if goal time is a local estimate rather than a national standard

Variance

difference between the Job Std and Actual Hours (0 of there is no Std)

+ the order of the columns will change depending on the sort criteria selected

 