The Applied Labor report lists jobs that have applied labor during the period. Selections include the standard date area, Shop User(s), and Shift. Additional selections include correction, job types, standard times to include, and road calls to include. Sort the report by correction, shop user, date, or shift. The appearance of the report changes depending on the sort criteria selected. If you sort by correction, the report displays an average for, Actual Hours, Job Standard, and Variance. If you sort by shop user, the report displays a subtotal of the Actual Hours and Variance for each date and the total Actual Hours and Variance for each shop user. If you sort by date, the report displays the total Actual Hours and Variance. If you sort by shift, the report displays a subtotal of the Actual Hours and Variance and the total Actual Hours and Variance.
Applied Labor Report Columns
Column |
Description |
ID |
the shop user’s nick name from the Setup Techs option |
Name |
the shop user’s last and first name |
Shift |
the shift of the shop user |
Date |
date that labor was applied (* means shared/split job) |
Correction |
job description |
Unit# |
unit number entered in RO |
Actual Hours |
number of labor hours applied |
Job Std |
goal time |
Est |
Y if goal time is a local estimate rather than a national standard |
Variance |
difference between the Job Std and Actual Hours (0 of there is no Std) |
+ the order of the columns will change depending on the sort criteria selected