To designate the shift to conduct the repairs,
1. From the Planner page, click the Shift link for the RO.
The Set Shift page opens.
2. Click the arrow and select First, Second or Third to assign the shift.
3. Click the Save button.
You return to the Planner page and the shift is assigned.
Updated December 16, 2004