The ScoreCard report is an abbreviated form of the Measurements report. It lists all of the people contributing to the score and should be posted in the shop so people can see it. Selections include the standard date area. You cannot sort the report.
Scorecard Elements
Number of Unfound Jobs
(For Finished jobs with National Projected Times only)
Number of Jobs |
the number of finished jobs that had a national projected time |
% of All Jobs |
the number of jobs with a national projected time as a percent of all finished jobs |
Nbr within Projected |
the number of jobs completed within the national projected time |
% within Projected |
the number of jobs completed within projected time as a percent of all jobs with a national projected time |
Actual Time |
the sum of applied time for jobs with national projected times |
Projected Time |
the sum of the projected times |
Actual vs Projected |
the total actual time minus the total projected time |
% |
the actual time as a percent of the projected time |
(For Finished Jobs with Local Projected Times only)
Number of Jobs |
the number of finished jobs that had a local projected time |
% of All Jobs |
the number of jobs with a local projected time as a percent of all finished jobs |
Nbr within Projected |
the number of jobs completed within the local projected time |
% within Projected |
the number of jobs completed within projected time as a percent of all jobs with a local projected time |
Actual Time |
the sum of applied time for jobs with local projected times |
Projected Time |
the sum of the projected times |
Actual vs Projected |
the total actual time minus the total projected time |
% |
the actual time as a percent of the projected time |